Pune: Central Railway Shifts Terminal Point For Two Daily Trains To Hadapsar From January 26
Pune: Central Railway Shifts Terminal Point For Two Daily Trains To Hadapsar From January 26
Pune, November 17, 2025: Central Railway has announced that the terminal point for two daily train services currently operating from Pune Junction will be shifted to Hadapsar (HDP) starting January 26, 2026. The move aims to streamline rail operations and improve passenger convenience.
According to the Pune Division of Central Railway, both the Hadapsar–Hazur Sahib Nanded Express and the Hadapsar–Harangul Special will now originate and terminate at Hadapsar instead of Pune Junction. All revised timings and halts will come into effect on the same date.
Revised Train Details
1. Train No. 17629 / 17630 — Hadapsar–Hazur Sahib Nanded–Hadapsar Express (Daily)
17629 Hadapsar → Hazur Sahib Nanded
Departs Hadapsar at 21:50 hrs (will no longer start from Pune).
Revised halts: Loni, Uruli, Yevat, Kedgaon, Patas, Daund Chord Line (Arr 22:45 / Dep 22:47).
17630 Hazur Sahib Nanded → Hadapsar
Arrives Hadapsar at 04:35 hrs (will no longer terminate at Pune).
Revised halts: Daund Chord Line (Arr 03:28 / Dep 03:30), Patas, Kedgaon, Yevat, Uruli, Loni.
Timings at all other stations remain the same.
2. Train No. 01487 / 01488 — Hadapsar–Harangul–Hadapsar Special (Daily)
01487 Hadapsar → Harangul Special
Departs Hadapsar at 06:20 hrs.
Revised halts: Loni, Uruli (Arr 06:43 / Dep 06:45), Yevat, Kedgaon (Arr 07:05 / Dep 07:07), Patas, Daund (Arr 07:40 / Dep 07:42).
01488 Harangul → Hadapsar Special
Arrives Hadapsar at 20:45 hrs.
Revised halts: Daund (Arr 19:33 / Dep 19:35), Patas, Kedgaon (Arr 19:56 / Dep 19:58), Yevat, Uruli (Arr 20:18 / Dep 20:20), Loni.
All other en-route timings remain unchanged.
Passengers have been advised to take note of these changes before planning their travel.



