Temporary Diversions to PMPML Bus Routes on Baner Road from 12 – 15 August

Pune Pulse Pune Mumbai Expressway : Traffic restrictions announced amid visit of President Draupadi Murmu to Lonavala
Share This News

Baner Road, spanning from Someshwar Wadi Phata to Mahabaleshwar Hotel Baner, is set to experience a brief closure from the 12th to the 15th of August 2023. This closure is attributed to the ongoing activities related to Phase 3 of the Shivajinagar to Hinjewadi Metro Project. Consequently, adjustments have been made to the routes of several bus numbers, including 114, 208, 256, 258, and 360, to accommodate this situation.

For the specified period, the modified routes for buses operating on routes 114, 208, 256, 258, and 360 headed towards Baner are as follows:

The buses will make a right turn at Baner Phata Chowk, followed by a left turn at Sarja Hotel. They will continue their route through Aundh ITI and Parihar Chowk, subsequently making a right turn at DP Road at Ambedkar Chowk. Afterward, a left turn will be taken at Medi Point Hospital, leading the buses to proceed straight on Link Road. Upon reaching the square, the buses will take a left turn, ultimately rejoining the regular route from Baner bus stand to Kapil Malhar square.

Balwadkar

Passengers utilizing these routes are advised to take note of these temporary changes, with the reassurance that normal bus operations will resume for all routes starting from the 16th of August onwards.

IMG-20250324-WA0012

Shreyas Vange

IMG-20250820-WA0009
85856