Pune Traffic Police announce traffic diversion due to underpass work , check Details

Traffic Diversion on Pune University Road , Check Details

Traffic Diversion on Pune University Road , Check Details

Share This News

The Pune Traffic police have issued traffic diversions as asphalt mastic work will be done by the PMC at Wakdewadi underpass.

As per further information from Pune Traffic Police, from 12:01 am on 22/12/2023 to 6 am on 26/12/2023, asphalt mastic work will be done by the Pune Municipal Corporation (PMC) at Wakdewadi. Hence, for safe and smooth traffic in Pune city, the following changes are being made in traffic at Wakdewadi in Pune City:

·         From N T Wadi, traffic flow will continue on the road from Khadki to Patil Estate through Wakdewadi underpass.

·         From Khadki underpass, the road leading to N T Wadi will be closed. Motorists should commute from the Engineering College bridge.

·         The underpass from Patil Estate to N T Wadi will remain closed. Motorists should use the Engineering College bridge.

Provided that the repair work proceeds as planned, the diversions are scheduled to last for four days. To ensure that there is as little disruption as possible for drivers during this time, the Pune Traffic Police have issued the diversion.

Shreyas Vange