Aditya’s Breeze Park in Balewadi Goes Green : Installs Rooftop Solar Power Plant of 75 kW

Share This News

In a bid to embrace sustainable energy, Aditya’s Breeze Park Society in Balewadi proudly unveiled its new 75 kW Solar Power Generation plant on March 26, 2024. The ceremony, graced by Pankaj Tagalpallewar, Additional Director General of MEDA (Maharashtra Energy Development Agency), marked a significant step towards energy conservation.

The installation, which cost around 43 lakh rupees, is projected to pay for itself within four years. “All electric devices within the society, including elevators, pumps, common lights, and the swimming pool, will now run on 100% solar power,” added a representative from Aditya’s Breeze Park.

Manas Sharma, the society’s Secretary, commended Tagalpallewar’s contributions to sustainable energy development, while Yogendra Singh, the President, reflected on the society’s green journey. Manoj Kumar, the Treasurer, extended gratitude to all involved.